Plan 9 from Bell Labs’s /usr/web/sources/patch/applied/doc-man-1-p9psync/cal.new

Copyright © 2021 Plan 9 Foundation.
Distributed under the MIT License.
Download the Plan 9 distribution.


.TH CAL 1
.SH NAME
cal \- print calendar
.SH SYNOPSIS
.B cal
[
.I month
]
[
.I year
]
.SH DESCRIPTION
.I Cal
prints a calendar.
.I Month
is either a number from 1 to 12,
a lower case month name,
or a lower case three-letter prefix of a month name.
.I Year
can be between 1
and 9999.
If either
.I month
or
.I year
is omitted, the current month or year is used.
If only one argument is given, and it is a number larger than 12,
a calendar for all twelve months of the given year is produced;
otherwise a calendar for just one month is printed.
The calendar
produced is that for England and her colonies.
.PP
Try
.EX
	cal sep 1752
.EE
.SH SOURCE
.B /sys/src/cmd/cal.c
.SH BUGS
The year is always considered to start in January even though this
is historically naive.
<<<<<<< cal.orig
.br
=======
.PP
>>>>>>> cal
Beware that
.L "cal 90"
refers to the early Christian era,
not the 20th century.

Bell Labs OSI certified Powered by Plan 9

(Return to Plan 9 Home Page)

Copyright © 2021 Plan 9 Foundation. All Rights Reserved.
Comments to webmaster@9p.io.