| Model file | Represents |
|---|---|
| assign0.mod | Job assignment problem, using n2 zero-one variables |
| assign1.mod | . . . instead using n integer variables, with alldiff operator |
| assign2.mod | . . . also using a variable as a subscript in the objective |
| assign3.mod | . . . instead using n object-valued variables |
| flowshp0.mod | Flowshop problem, using n2 zero-one variables |
| flowshp1.mod | . . . instead using n integer variables, with the or operator |
| flowshp2.mod | . . . instead using n integer variables, with the if-then operator |
| sched0.mod | Job scheduling problem, using n2 zero-one variables |
| sched1.mod | . . . instead using n integer variables, with the count operator |
| sched2.mod | . . . instead using n integer variables, with the countof operator |
| seq0.mod | Job sequencing problem, using n2 zero-one variables |
| seq1.mod | . . . instead using 2n integer variables, with variables in subscripts |
| seq2.mod | . . . also using min in constraint to define the finish times |
| seq0a.mod | Like seq0.mod, but using a set of objects for jobs |
| seq1a.mod | Like seq1.mod, but using object-valued variables for jobs |
seq: C. Jordan and A. Drexl, "A Comparison of Constraint and Mixed-Integer Programming Solvers for Batch Sequencing with Sequence-Dependent Setups." ORSA Journal on Computing 7 (1995) 160-165.
Return to the AMPL proposed new features page.
Return to the AMPL update page.